loader
aecon-logo
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
aecon-logoaecon-logo
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us

Saudi Ministry of Transportation

Sand Movement Control for Road Infrastructure Improvements

Saudi Ministry of Transportation Project
Saudi Ministry of Transportation Project
Saudi Ministry of Transportation Project
Saudi Ministry of Transportation Project
Saudi Ministry of Transportation Project
3S-300 Product
3S-SSP Product
Scope: Sand berm, shoulder road and paved shoulder construction and stabilization.
Products: 3S-300 + 3S-SSP
Application: Topical + Infused Method
Duration: Six Months

Overview:

The development of a robust and efficient road infrastructure is essential for supporting economic growth, improving transportation connectivity, and enhancing overall mobility within a country. Recognizing the significance of high quality road networks, AECON and the Saudi Ministry of Transportation formed a collaborative partnership aimed to address multiple aspects of road infrastructure improvements and the prevention of sand accumulation on the roads.

The successful completion of the project and the achievement of its objectives led to the prevention of sand accumulation on the roads, ensuring a safer driving experience.

Objectives:

  • Prevention of sand accumulation on roads.
  • Safety and operational efficiency.
  • Adherence to standards and regulations.

Activities:

  • Engineering surveys.
  • Sand removal and site preparation.
  • Berm construction and stabilization.
  • Road and pavement construction.
Prev Post
Next Post

Related projects

Ministry of Public Works Projects
Erosion Control, Sand Stabilization, Slope Protection

Ministry of Public Works

Combating the effects of heavy rainfall on road infrastructure.
Saudi Ministry of Transportation Project
Berm Construction, Sand Movement Control, Sand Stabilization

Saudi Aramco

Preventing sand encroachment along pipeline service roads.
Saudi Railway Authority Project.
Berm Construction, Sand Movement Control, Sand Stabilization

Saudi Railway Authority

Reducing sand deposition on railway tracks to improve transportation.
Company
  • About Us
  • Environmental Benefits
  • Our Expertise
Applications
  • Road Construction
  • Oil & Gas
  • Military & Defense
  • Agriculture
  • Aviation
  • Renewable Energy
3S Products
  • 3S-100
  • 3S-200
  • 3S-300
  • 3S-SSP
© 2023. AECON General Contracting.
Privacy Policy | Terms & Conditions | Sitemap