loader
aecon-logo
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
aecon-logoaecon-logo
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us
  • About
    • About Us
    • Why Choose Us
    • Our Clients
  • 3S Technology
  • 3S Products
  • Applications
  • Case Studies
  • Contact Us

Saudi Railway Authority

Sand Movement Control for Railway Tracks

Saudi Railway Authority Project
Saudi Railway Authority Project
Saudi Railway Authority Project
Saudi Railway Authority Project
3S-200 Product
3S-200 Product
Scope: Berm stabilization covering 400km parallel to railway tracks between Dammam and Riyadh.
Products: 3S-200
Application: Topical
Duration: Three Years

Overview:

The railway industry plays a crucial role in facilitating efficient transportation and connectivity, promoting economic growth, and improving mobility for nations across the globe. Recognizing the significance of a robust rail infrastructure, AECON and the esteemed Saudi Railway Authority joined forces to address a critical challenge faced by the railway system in Saudi Arabia: Prevention of sand accumulation and protection of railway tracks.

The successful completion of the project and achievement of the defined objectives led to the prevention of sand accumulation and the incorporation of additional protection and efficiency measures for the railway tracks.

Objectives:

  • Prevention of sand accumulation on railway tracks.
  • Adherence to standards and regulations.
  • Environmental stewardship.

Activities:

  • Engineering surveys.
  • Sand removal and site preparation.
  • Berm construction and stabilization.
Prev Post
Next Post

Related projects

Ministry of Public Works Projects
Erosion Control, Sand Stabilization, Slope Protection

Ministry of Public Works

Combating the effects of heavy rainfall on road infrastructure.
Saudi Ministry of Transportation Project
Berm Construction, Sand Movement Control, Sand Stabilization

Saudi Aramco

Preventing sand encroachment along pipeline service roads.
Saudi Ministry of Transportation Project
Berm Construction, Road Construction, Sand Movement Control, Sand Stabilization

Saudi Ministry of Transportation

Road infrastructure improvements preventing sand accumulation on roads
Company
  • About Us
  • Environmental Benefits
  • Our Expertise
Applications
  • Road Construction
  • Oil & Gas
  • Military & Defense
  • Agriculture
  • Aviation
  • Renewable Energy
3S Products
  • 3S-100
  • 3S-200
  • 3S-300
  • 3S-SSP
© 2023. AECON General Contracting.
Privacy Policy | Terms & Conditions | Sitemap